Installation
10 acres in 10 days.
Our own crews, our own components, one schedule.

200
in-house installers
10 : 10
acres installed in days
1
point of responsibility
The ten-day build.
From bare ground to finished greenhouse in ten days. Here's how we do it.
Days 1-2
Site Prep
Ground levelling, drainage, footings
Days 3-4
Frame
Structural skeleton erected
Days 5-6
Envelope
Panels and covering installed
Days 7-8
Systems
Water, irrigation, controls
Days 9-10
Finish
Racks, trays, final checks
One day, one acre.
- Day 1
- Day 2
- Day 3
- Day 4
- Day 5
- Day 6
- Day 7
- Day 8
- Day 9
- Day 10
Each square is one day and one acre at full crew capacity. Site schedules depend on ground preparation and access.

Why it is fast
One team from factory to site.
Components are made to fit in our factory, so crews assemble rather than adapt on site.
The same company makes and installs, so there is one point of responsibility.
Start a conversation.
Tell us your site, acreage and timeline. We will come back with a specification and quote.